The Pipe Boots Should Not Disappear Inside the Roof Price
Learn how to compare roof bids by the plumbing vent flashings they include, the materials specified, and the treatment of damaged decking.
A plumbing vent may be one of the smallest objects shown on a roofing proposal. It is also a common place for water to enter. Before choosing between two St. Louis roofers, count the pipes that pass through your roof and find the corresponding line in each bid. A proposal that says only "replace roof" leaves an important question unanswered: Is the contractor replacing each pipe boot, reusing the existing flashing, or deciding after the shingles are removed?
The pipe itself serves the plumbing system. The pipe boot, sometimes called a pipe flashing or vent flashing, seals the opening where that pipe passes through the roof. On many houses, the flashing has a metal or plastic base and a rubber collar around the pipe. Sunlight, heat, freezing weather, and movement can eventually split or loosen that collar. New shingles placed around an old collar do not make the collar new.
Roofer comparison
Start by making the bidders count the same penetrations. A simple ranch may have two plumbing vents. A larger house with additions may have several pipes scattered across different slopes. One may be visible from the driveway while another sits behind a ridge or chimney. If one estimate includes three new flashings and another includes two, the totals are not based on the same work.
The next comparison is the proposed treatment. Look for language that clearly says the existing shingles and pipe flashing will be removed and a new flashing installed. "Seal around vents" is not the same instruction. Sealant can be part of a proper detail, but a bead applied over an aging rubber collar does not turn it into a new assembly.
Ask what material the bidder intends to use. Pipe flashings are sold in several forms. Some use an exposed rubber collar. Others use a longer lasting collar design or a metal assembly selected for the pipe and roof. The proposal does not need to read like a product catalog, but it should identify the type well enough that you can compare it with the other quote.
Size matters too. The opening in a flashing must fit the outside diameter of the pipe. A collar that is stretched beyond its intended range can split early. A collar that is too loose cannot make a dependable seal. If the proposal lists a single generic flashing for every pipe, ask whether the crew will verify the diameters before materials are ordered.
Then ask how the flashing will be integrated with the shingles. Water should drain over the exposed lower portion of the flashing rather than encounter a continuous dam of sealant. The upper part belongs beneath the courses above it. The exact detail varies by flashing design, roof slope, and manufacturer instructions, but the basic question is concrete: Will the crew weave the new flashing into the roof covering, or merely coat the old detail?
This comparison becomes more important on an older three tab roof. Once those shingles are brittle, lifting and resealing a small area around a pipe can break nearby tabs. At that age and condition, a repair that looks narrow on paper can spread across the slope. A roofer should be able to explain whether the surrounding shingles remain workable before offering a small pipe boot repair as the complete answer.
St. Louis weather exposes weak details. Summer heat works on rubber components. The freeze thaw cycle opens small gaps that appeared harmless in warm weather. Snow and ice at the eave can slow drainage, although a plumbing vent higher on the slope has a different exposure from the bottom edge. Hail can also mark a metal flashing without proving that water is entering there. The comparison should stay focused on the condition of the assembly and the proposed replacement method.
What it costs
A pipe boot line may be priced individually, included in a roof system total, or carried as an allowance. Any of those formats can be usable if the scope is clear. The trouble starts when one contractor includes replacement and another leaves the decision for installation day. The lower total may simply omit work that the other bidder counted.
Ask whether the stated price covers removal, the new flashing, installation, surrounding shingles, and ordinary sealing materials. Also ask whether unusually large pipes, metal vent stacks, or specialty flashings have separate prices. A cast iron stack may call for a different approach from a smaller plastic plumbing vent. That difference should not first appear as an unexplained charge while the roof is open.
The wood around a vent deserves its own rule. A long standing leak can soften the roof deck at the opening. The contractor cannot always confirm that condition from above before removing the shingles and flashing. Your proposal should state how damaged decking is measured and priced if it is found. It should also say who shows you the damage before additional sheets or boards are installed, except where immediate covering is necessary to protect the house.
Do not compare only the unit price of the boot. Access can affect labor. A pipe near a steep transition, chimney, solar array, or high rear slope is not approached like one on a low garage roof. Roof pitch and staging can explain a legitimate price difference. Ask the bidder to connect that difference to a visible condition on your house.
Municipal requirements are another reason to compare scope instead of assumptions. St. Louis County contains many separate permit desks, and requirements can depend on the municipality where the property sits. Ask each contractor whether a roofing permit applies at your address, who will obtain it, and whether its cost is included. A permit does not select the flashing material for you, but the answer shows whether both bids account for the same administrative work.
What to ask
Put these questions to each bidder in the same order. Record the answers beside the estimate rather than relying on what you remember from the kitchen table conversation.
- How many plumbing vent pipes did you count on this roof?
- Does your price include a new flashing for every counted pipe?
- What type and size of flashing will you install?
- Are any existing pipe flashings being reused?
- Will the old flashing be removed before the new one is installed?
- How will the new flashing be integrated with the shingle courses?
- What happens if the pipe is an unusual diameter or material?
- How will damaged decking around the opening be documented and priced?
- Does the proposal include the required permit for this address, if one applies?
- Will the completed vent details appear in the final job photos?
Photographs help settle the count. Ask for one overview showing where each pipe sits and a closer image of any cracked collar, exposed fastener, corrosion, lifted edge, or previous sealant repair. A close photograph without a wider view can be hard to place later. The useful record connects the condition to a particular slope and penetration.
If a bidder recommends an upgraded flashing, ask for the exact product description in the proposal. That lets you determine whether the higher price buys a different assembly or merely reflects different wording. It also gives the installation crew a written instruction. The same discipline applies to the shingles around it. Keys Roofing installs Atlas and Malarkey shingles, so a Keys proposal should identify the selected shingle and the pipe flashing treatment as separate parts of the roof system.
Be cautious with an answer such as "we take care of all vents" if the written proposal remains silent. Ask for the count and treatment to be added before signing. A short sentence can do the job: remove and replace three plumbing vent flashings, sized to the existing pipes, with damaged decking handled at the stated unit rate. Specific language makes the competing prices easier to read and gives the crew a usable scope.
If you want Keys Roofing to inspect the penetrations and prepare a written comparison point, call (314) 220-2333. Keep the photographs, measurements, flashing count, and written scope with your other bids. Then compare the same number of openings, the same replacement decision, and the same rule for concealed wood before deciding which proposal to accept.

Want Keys Roofing on your roof?
Every argument on this site is that a list cannot tell you whether a crew is any good, and that you have to get somebody on the roof and read what they write down. Keys Roofing is the company this site puts at number one on both of its rankings, and it holds that position on the five criteria printed in the How we rate box rather than on anything Google publishes about it.
What an inspection here produces is a set of photographs, a measurement of the roof, and a written scope that names the material, the underlayment, the flashing work, the ventilation and what happens if the decking underneath turns out to be soft. You keep that document whether or not you hire anyone. If a storm claim is part of your story, the claim stays in your name: under RSMo 407.725 a Missouri roofing contractor may not represent or negotiate it for you, and Keys does not.
Roofing, gutters and downspouts across greater St. Louis. No siding, no windows, no commercial work.
This reaches Keys Roofing, the number one entry on both rankings. It does not reach any of the other companies named on this site, and nothing you type here is passed to them.